John Collins Profile Image

John Collins

Associate
Client
Spencer Bridge Engineering Ltd.
Location
Grimsby, North East Lincolnshire, UK
Value
£5m
Market

Summary

Constructed in 1925, Corporation Bridge is a Grade II listed, six-span bridge crossing the River Freshney in Grimsby, Lincolnshire. It is of early steel rivetted construction and incorporates a rolling bascule “Scherzer” moving span. 

Roughan & O’Donovan (ROD) is supporting the contractor, Spencer Bridge Engineering Ltd., in undertaking refurbishment works to the bridge, including inspections and assessments, steelwork repairs, deck replacement design and several design studies.

Approach

Our team has adopted a responsive and pragmatic approach to the delivery of the project, including attending site on a regular basis and arranging in-person meetings with the wider stakeholders as necessary.

Solution

Our responsibilities include:

  • review and interpretation of historical information
  • design study to understand the live load capacity of the refurbished bridge
  • inspection for assessment
  • assessment of as-constructed capacity and sensitivity to corrosion and deterioration
  • steelwork repair principles, designs and specification
  • design of a replacement deck to lifting span
  • design of replacement concrete decks

Services provided:

  • Review and interpretation of historical information
  • Bridge inspection
  • Bridge assessment
  • Bridge engineering repair design
  • Category 3 checker procurement and management
  • Design studies and reporting