Our earthworks design included a 'floating' farm access road resting on deep peat deposits and supported by a geogrid strengthened capping layer.
Martin Brown

Martin Brown

Associate
Client
BAM-Dragados
JV Partner
AECOM
Value
€263m

Summary

Roughan & O’Donovan-AECOM provided full design and construction supervision services for this scheme comprising 41km of new build motorway, grade separated junctions, side roads, dual carriageway and 45+ bridge structures.

Solution

  • 41km of standard 2 lane motorway
  • 3km of single carriageway link roads
  • 15km of side roads
  • Three grade separated junctions
  • Motorway to motorway interchange between the M7 and M8
  • 46 principal structures
  • Over 120 box and pipe culverts
  • 4 significant river crossings, including the River Nore (136m viaduct) and River Goul (72m 3 span bridge)
  • 5 new railway overbridges
  • One railway overbridge widening
  • Numerous gantries

Structural design

As contractors’ designer, we were responsible for the design of the River Goul Bridge, a 3-span continuous structure with 450 skew made monolithic at the intermediate supports.

The bridge features a mainspan of 35m with 16m backspans, and consists of a precast U12 beam in the cross-section. The superstructure is supported on reinforced concrete intermediate and end supports that are piled.

  • Soft ground along the route raised significant challenges that were addressed in the earthworks design.

    Fintan Buggy Profile Photo

    Fintan Buggy

    Technical Director

Civil design

In undertaking the geotechnical design of earthworks, walls and structure foundations, we were responsible for the:

  • Preparation of geotechnical interpretative reports and earthworks section reports
  • Design of driven and bored pile foundations to bridges
  • Review of instrumentation monitoring data, static and dynamic pile load tests

Toll plaza and maintenance depot

In addition to the design of the bridge structures and roadworks, we also project managed the design process and acted as lead designer for the toll plaza and maintenance depot.

It comprised:

  • Curved toll plaza canopies
  • Two-storey office building over basement
  • Interconnecting tunnel structure providing access to the toll booths
  • Salt barn
  • Vehicular maintenance building
  • Associated yard facilities within a protected peat bog

Challenges

Delivering the detailed design of 46 principal structures and 120 culverts to construction issue, on a fast track programme, represented a challenge.  Doing so in a way that provided added value to the contractor and reduced maintenance liability for the PPP company, added further complexity.

Through detailed stage by stage construction analysis, we delivered value to the design of the structures whilst satisfying technical, aesthetic and environmental requirements.  In this way, we reduced the length of precast beam required by over 4.5km for example.

Services provided:

  • Bridge engineering design
  • Road design
  • Geotechnical design
  • Environmental design
  • Health & safety co-ordinator/PSDP
  • Construction supervision